进口高柔性电缆CF35.UL.500.03.O.PE德国易格斯igus工程动力电缆
北京精益福泰机电机械有限公司 塑料电缆拖链轴承
导体:<10mm²:高抗弯强度的精细裸铜多股线
≥10mm²:细铜线先编织成束然后绞在一起
Servicing: Highly flexible cables raise machine availability in the furniture industry.
In the ADA furniture factory, there are many things that move: disk sawing machines, bearings, material cutting machines and many more. The motor and control cables used here have to be pretty much resistant and flexible in a fourteen-hour work a day. Requirements that are ideally fulfilled by the flexible igus® "Chainflex®" cable range specially made for energy chains.
CF35.UL.05.04 芯数及截面积:(4G0.5)C 最大外径:8.0mm 铜含量:39kg/km 重量:81kg/km
CF35.UL.07.04 芯数及截面积:(4G0.75)C 最大外径:8.5mm 铜含量:52kg/km 重量:104kg/km
CF35.UL.15.04 芯数及截面积:(4G1.5)C 最大外径:9.5mm 铜含量:85kg/km 重量:149kg/km
CF35.UL.25.04 芯数及截面积:(4G2.5)C 最大外径:11.5mm 铜含量:128kg/km 重量:207kg/km
CF35.UL.40.04 芯数及截面积:(4G4.0)C 最大外径:13.5mm 铜含量:201kg/km 重量:326kg/km
CF35.UL.60.04 芯数及截面积:(4G6.0)C 最大外径:16.0mm 铜含量:298kg/km 重量:450kg/km
CF35.UL.100.04 芯数及截面积:(4G10.0)C 最大外径:19.5mm 铜含量:454kg/km 重量:682kg/km
CF35.UL.160.04 芯数及截面积:(4G16.0)C 最大外径:23.0mm 铜含量:723kg/km 重量:1003kg/km
CF35.UL.250.04 芯数及截面积:(4G25.0)C 最大外径:27.5mm 铜含量:1160kg/km 重量:1524kg/km
CF35.UL.60.03.O.PE 芯数及截面积:(3X6.0)C 最大外径:14.5mm 铜含量:231kg/km 重量:367kg/km
CF35.UL.100.03.O.PE 芯数及截面积:(3X10.0)C 最大外径:17.5mm 铜含量:356kg/km 重量:568kg/km
CF35.UL.160.03.O.PE 芯数及截面积:(3X16.0)C 最大外径:21.0mm 铜含量:553kg/km 重量:789kg/km
CF35.UL.250.03.O.PE 芯数及截面积:(3X25.0)C 最大外径:24.5mm 铜含量:884kg/km 重量:1208kg/km
CF35.UL.350.03.O.PE 芯数及截面积:(3X35.0)C 最大外径:28.5mm 铜含量:1200kg/km 重量:1675kg/km
CF35.UL.500.03.O.PE 芯数及截面积:(3X50.0)C 最大外径:33.5mm 铜含量:1660kg/km 重量:2283kg/km
德国进口工程塑料电缆igus易格斯动力电缆
CF35.UL.500.03.O.PE 数据:3X50.0mm² 芯数1:U/L1/C/L+ 芯数2:V/L2 芯数3:W/L3/D/L- 芯数4:4/N
A leather cutting station of American origin had the ADA's technical department pretty much in sweat for several years. "There were problems with the machine right from the start. I've never seen in my whole life such cables, how they were integrated there. We had to replace the cables every two months," reminisces Johann Doler, technical director, about the station with a shudder, which had brought him much worry and work. A cable replacement meant a time wastage of up to one day: "Detect the failure, pull out the cable, put them back in - which moreover was not so simple at all, because the cable must pass through not only the energy chain but in some duct or the other of the machine," says the ADA technician.
典型应用场合